Project handover · Cairo, Egypt ·
ACROW Misr's new power & free line loads from the floor
YING handed over a power & free powder coating line to ACROW Misr in Helwan, Cairo. Its elevator-robot loading station brings each load bar down to ground level, so heavy formwork and scaffolding parts are hung without working at height.
READ THE STORY + WATCH →