03

MILESTONE · EGYPT

Egypt's first 3 m/min vertical powder coating line

Built by Ying Group in 2023 — the first vertical powder coating line in the country to run at 3 metres per minute.

3m/min line speed
2023Built
1stOf its kind in Egypt

In 2023 Ying Group built a vertical powder coating line in Egypt that runs at 3 metres per minute — the first vertical line in the country to reach that speed.

The line in production: aluminium profiles hung vertically, through pretreatment, powder and curing to finished profiles · 3:13

Why a vertical line

A vertical powder coating line hangs aluminium profiles upright and carries them through pretreatment, powder application and curing on an overhead conveyor. Vertical systems favour high-volume aluminium profile factories. Our guide to vertical vs. horizontal lines covers when each layout fits.

More from our vertical lines

Read our El Arabia Factory case study, or watch a Ying vertical line in round-the-clock production on the vertical line page.

PLANNING A VERTICAL LINE?

TALK TO AN ENGINEER →