INSIDE THE LINE
EVERY SYSTEM. EVERY STATION.
A complete coating line is not just one machine. Ying Group supplies the full process chain:
pretreatment, drying, spraying, curing, conveying, recovery, controls, and commissioning.
01
Surface Pretreatment
3 to 7 stage tunnel systems for degreasing, rinsing, conversion coating, and C5-ready preparation.
02
Dry-Off Oven
Controlled moisture removal before coating, sized around line speed, workpiece mass, and heating preference.
03
Powder Coating Booth
Manual, automatic, or fast color-change booth layouts with airflow, reclaim, and operator access planned together.
04
Automatic Guns & Robots
Reciprocators, gun positioning, and optional robotic spraying for repeatable film build on complex profiles.
05
Powder Recovery / Recycle System
Cyclone and filter recovery options to reduce powder waste, improve cleanliness, and support production changeovers.
06
Curing Oven
Gas, electric, or diesel heating with airflow and dwell time matched to powder chemistry and coating thickness.
07
Overhead Conveyor
Monorail or power & free conveyor layouts for loading, accumulation, booth travel, oven dwell, and unloading.
08
PLC + HMI Control
Touchscreen control, recipes, alarms, conveyor tracking, temperature monitoring, and service-friendly diagnostics.